GSKClient: GlaxoSmithKline (GSK)
Main Contractor: Pyeroy Group
Work: Pyeroy has refurbished two pipe bridges at GSK’s Curabinny, County Cork plant. The project management and refurbishment work included the design and installation of all scaffolding access and containment systems, the grit blasting of structural steelwork and repainting to appropriate industry standards and specifications.
Arklow wind turbinesClient: GE
Main Contractor: Smulders BV
Work: Specialist scaffolding systems have been provided to support the coatings refurbishment of the main towers belonging to the Arklow Offshore Wind Farm located in the Irish Sea. All the equipment, men and materials were transported to and from the wind farm using special shallow draft vessels.